06.05-1986 (SBIR 1990-1)
Real-Time Expert Systems
|
Integrated Software Inc Samuel Harbaugh,
|
$50,000.00 |
FL |
N/A |
JSC |
1990 |
12.06-7947A (SBIR 1990-1)
High Definition Full Color Virtual Image Processing
|
Electronic Imagery Inc Sherry Simmons,
|
$49,640.00 |
FL |
N/A |
JSC |
1990 |
07.11-2732 (SBIR 1990-1)
Multi-Media Planetary Hyperbook
|
Hypertech Systems Madeline Kovarik,
|
$49,882.00 |
FL |
N/A |
JPL |
1990 |
09.11-3550 (SBIR 1990-1)
Nontoxic Heat Transport Fluids for Habitat Two-Phase Thermal Control Systems
|
Mainstream Engineering Corporation John Carluccio,
|
$48,130.00 |
FL |
N/A |
JSC |
1990 |
05.04-7828 (SBIR 1990-1)
Sensor Based Whole-Arm Obstacle Avoidance For Redundant Robot Arm Manilpulators
|
Merritt Systems Inc Daniel Wegerif,
|
$49,929.00 |
FL |
N/A |
KSC |
1990 |
09.11-3550 (SBIR 1990-2)
Nontoxic, Heat-Transport Fluids for Habitat Two-Phase, Thermal-Control Systems
|
Mainstream Engineering Corporation Robert Scaringe,
|
$439,300.00 |
FL |
N/A |
JSC |
1990 |
12.06-7947A (SBIR 1990-2)
Orbiter System Imaging Card for High-Definition, Full-Color, Virtual-Image Processing
|
Electronic Imagery Inc Gerald Smith,
|
$486,600.00 |
FL |
N/A |
JSC |
1990 |
05.04-7828 (SBIR 1990-2)
Sensor Based Whole-Arm Obstacle Avoidance for Redundant Robot Arm Manilpulators
|
Merritt Systems Inc Douglas Rosinski,
|
$500,000.00 |
FL |
N/A |
KSC |
1990 |