Firm Information | |
---|---|
Name: | Quest Integrated, LLC |
Address: | 19823 58th Place South, Suite 200 |
City/State/Zip: | Kent, Washington, 98032 |
Phone: | (480) 872-9500 |
Official Name: | Vincent Fratello |
Website: |
Firm Statistical Data | |
---|---|
Number of Awards: | 20 |
Click on the project title to view the associated abstract
Note: Click on the appropriate column heading to sort by that category.
Abstracts
>Title | Firm | Award Amount | State | Mission Directorate | Center | Year |
---|---|---|---|---|---|---|
H13.02-8093 (SBIR 2016-1)
Active Metamaterial Based Ultrasonic Guided Wave Transducer System |
Quest Integrated, LLC Vincent Fratello, V.Fratello@qi2.com |
$124,978.00 | WA | HEOMD | LaRC | 2016 |
H13.02-7477 (SBIR 2016-1)
Printed Ultra-High Temperature NDE Sensors for Complex Structures |
Quest Integrated, LLC Vincent Fratello, v.fratello@qi2.com |
$125,000.00 | WA | HEOMD | LaRC | 2016 |
20.08-9500 (SBIR 1997-1)
An Infrared Microspectroscopy Imaging System |
Quest Integrated, LLC Albert Chau, alchau@qi2.com |
$69,165.00 | WA | N/A | LaRC | 1997 |
04.07-9500 (SBIR 1996-1)
An Advanced Thermal Analysis Microscope For In Situ Measurement Of Material Properties |
Quest Integrated, LLC Diana Suzuki, |
$69,839.00 | WA | N/A | LaRC | 1996 |
02.01-9500 (SBIR 1990-1)
New Subgrid Model For Large-Eddy Simulations Of Mixing And Chemical Reaction In Turbulent Flows |
Quest Integrated, LLC Diana Suzuki, |
$49,941.00 | WA | N/A | ARC | 1990 |
01.01-9500 (SBIR 1990-1)
New Unsteady Mixing Model To Predict Nox Production During Rapid Mixing In A Dual-Stage Combustor |
Quest Integrated, LLC Diana Suzuki, |
$49,972.00 | WA | N/A | GRC | 1990 |
01.01-9500 (SBIR 1990-2)
New,Unsteady Mixing Model to Predict NOx Production in Turbulent Flames |
Quest Integrated, LLC Diana Suzuki, |
$464,350.00 | WA | N/A | GRC | 1990 |
01.05-8500 (SBIR 1987-1)
Shock Waves for Enhanced Mixing in Scramjet Combustors |
Quest Integrated, LLC , |
$48,733.00 | WA | N/A | GRC | 1987 |
04.03-8500 (SBIR 1986-1)
Nonequilibrium Phase Chemistry in High-Temperature Structural Alloys |
Quest Integrated, LLC , |
$49,932.00 | WA | N/A | LaRC | 1986 |
15.04-8500 (SBIR 1986-1)
The Synthetic Production of Large Single Crystals |
Quest Integrated, LLC , |
$45,000.00 | WA | N/A | GRC | 1986 |
04.03-8500 (SBIR 1986-2)
Nonequilibrium Phase Chemistry in High-Temperature Structural Alloys |
Quest Integrated, LLC , |
$496,300.00 | WA | N/A | LaRC | 1986 |
02.04-8500B (SBIR 1985-1)
Turbulence Control on an Airborne Laser Platform |
Quest Integrated, LLC , |
$50,000.00 | WA | N/A | LaRC | 1985 |
02.10-8500 (SBIR 1985-1)
Numerical Simulation of Impinging Jets |
Quest Integrated, LLC , |
$49,143.00 | WA | N/A | ARC | 1985 |
02.08-8676 (SBIR 1984-1)
Optical Slip-Ring for High-Density-Data Communication Links |
Quest Integrated, LLC , |
$49,741.00 | WA | N/A | LaRC | 1984 |
02.02-8500A (SBIR 1984-1)
Generating an Artificial Burst in a Turbulent Boundary Layer |
Quest Integrated, LLC , |
$49,742.00 | WA | N/A | LaRC | 1984 |
01.01-8500 (SBIR 1984-1)
Optimization Procedure for Aerodynamic Design for Advanced Turboprop |
Quest Integrated, LLC , |
$49,750.00 | WA | N/A | GRC | 1984 |
02.02-8500A (SBIR 1984-2)
Generating an Artificial Burst in a Turbulent Boundary Layer |
Quest Integrated, LLC , |
$294,000.00 | WA | N/A | LaRC | 1984 |
01.01-8500 (SBIR 1984-2)
Optimization Procedure for Aerodynamic Design for Advanced Turboprop |
Quest Integrated, LLC , |
$255,000.00 | WA | N/A | GRC | 1984 |
02.03-8500 (SBIR 1983-1)
Transonic Wall Interference Assessment and Correction |
Quest Integrated, LLC , |
$48,000.00 | WA | N/A | ARC | 1983 |
02.03-8500 (SBIR 1983-2)
Transonic Wall Interference Assessment and Correction |
Quest Integrated, LLC , |
$261,000.00 | WA | N/A | ARC | 1983 |